Source-checked Once Human decision guide
Once Human Meta Hotline Vol. 12: What Is Live vs Planned?
Separate the live October 27 and November 4 Once Human changes from planned Mod, Deviation synthesis, character history, and demolition features.
Two Meta Hotline changes are documented as live, while four accepted requests remain in planning. Check the status before changing your inventory, progression plan, or territory.
Short answerMeta Hotline Vol. 12 documents two implemented adjustments: Lift-Off Energy Devices and Floating Aerogels became dismantlable with the October 27 (PT) update, and shortened animal-information text went live with the November 4 (PT) update. Four other requests were accepted but remained in planning and development: improving General Mod acquisition and quantities, displaying Last Played Time on the Character page, allowing bound Deviations with remaining uses in the main synthesis slot, and previewing the scope and effects of building demolition. No release date was supplied for those planned features. Check the current interface before making a decision that depends on one of them.
Read the status labels before changing your plan
Establish a dated boundary between implemented adjustments and accepted requests that were still being developed.
- Treat “went live” as an implementation statement tied to the update date given in Meta Hotline Vol. 12.
- Treat “accepted” and “in planning and development” as future-facing status, not confirmation that a control or workflow is currently available.
- Recheck later official update information and the current game interface because the source does not provide release dates for the planned work.
Changes documented as live
Identify the two adjustments the source says had already been implemented.
- Lift-Off Energy Devices and Floating Aerogels can be dismantled; the source assigns this adjustment to the October 27 (PT) version update.
- Text on the animal-information page was shortened and refined to reduce waiting for longer fields to scroll; the source assigns this adjustment to the November 4 (PT) version update.
- Verify the relevant option or text in the current interface before reorganizing many items or changing an established workflow.
General Mod output remains a planned optimization
Prevent a planning statement from being mistaken for a live progression change.
- The request to increase General Mod output was accepted and remained in planning and development.
- The stated direction covers both how players obtain General Mods and the quantities available, but the source supplies no finalized design or release date.
- Keep this scope separate from the existing Mod Guarantee discussion; the supplied evidence does not establish that they are the same change.
Character history and Deviation synthesis remain planned
Clarify what has been accepted without inventing implementation details.
- Displaying Last Played Time on the Character page was included in development plans, but the source does not say it is live.
- The current synthesis limitation described by the source prevents bound Deviations with remaining uses from occupying the main Deviation slot, requiring players to transfer them out and wait before using them.
- Allowing those Deviations in the main slot was accepted for development, but no implementation date, transfer duration, or additional synthesis rule was supplied.
Demolition preview remains planned
Give players a cautious territory-change workflow while avoiding overlap with the existing construction-controls guide.
- The accepted request is a preview of the scope and effects of building demolition before demolition occurs.
- The source says the feature is in development and asks players to wait for an official release date; it does not document current demolition behavior.
- Use the existing territory-construction checklist for documented Version 3.1.2 controls, but keep this planned demolition preview in a separate status category.
Use a pre-action status gate
Turn the update status into a repeatable decision process.
- Name the exact action you intend to take and identify whether it depends on a documented live adjustment or a planned feature.
- Check the current interface for the relevant option without assuming that an accepted request has shipped.
- If the decision depends on a missing planned feature, delay the dependent commitment or choose the smallest reversible step available in the current interface.
- Record the displayed version and relevant screen before reporting a mismatch or revisiting the decision after an update.
Decision checklist
- Name the item, progression choice, synthesis action, character-history check, or territory change you intend to make.
- Match that action to the exact Meta Hotline Vol. 12 status.
- Confirm whether the source says the adjustment went live or remained in planning and development.
- Check the relevant control or information in the current game interface.
- Keep General Mod output separate from Mod Guarantee unless later evidence explicitly connects them.
- Do not plan around the bound-Deviation main-slot change until the current interface confirms it.
- Do not plan around a demolition preview until the current interface confirms it.
- Recheck the decision after a relevant version update.
Worked example
Suppose you want to dismantle an unused Floating Aerogel and then remove part of a building. The dated source supports checking for the Floating Aerogel dismantling option because that adjustment was assigned to the October 27 (PT) update. It does not support assuming that a demolition preview is available, because that request remained in development. Confirm the item option in the current interface, then treat the territory change as a separate decision. If no demolition preview appears, record the intended area, preserve useful screenshots of the current layout, and limit the change to the smallest scope you can evaluate with the controls currently shown.
Common mistakes
- Treating every accepted request as an implemented feature.
- Assigning a release date that the source does not provide.
- Combining General Mod output with Mod Guarantee as though they are one documented change.
- Inventing transfer times or additional synthesis mechanics for bound Deviations.
- Assuming the planned demolition preview is part of the documented Version 3.1.2 construction controls.
- Using a dated implementation statement without checking the current interface.
Frequently asked questions
Which Meta Hotline Vol. 12 changes were documented as live?
Dismantling Lift-Off Energy Devices and Floating Aerogels was assigned to the October 27 (PT) version update. Shortened animal-information text was assigned to the November 4 (PT) version update.
Is increased General Mod output live?
The supplied source does not establish that it is live. It says improvements to acquisition methods and quantities were accepted and remained in planning and development.
Can a bound Deviation with remaining uses now occupy the main synthesis slot?
The supplied source describes that capability as a planned improvement. It does not confirm implementation, so check the current interface before relying on it.
Does building demolition now show a preview?
Meta Hotline Vol. 12 says the preview request was accepted and in development. It supplies no release date and does not establish that the preview is currently available.
Is the demolition preview part of the Version 3.1.2 construction controls?
The supplied evidence does not make that connection. Keep the documented Version 3.1.2 controls separate from the later planning status for demolition preview.
Related guides
Sources and review notes
Based only on E-01, the official Meta Hotline Vol. 12 captured excerpt. The guide-inventory excerpts were used solely to avoid duplication and resolve overlap: this page provides a cross-feature live-versus-planned status check, while the existing territory and Mod Guarantee pages retain their narrower decision roles.
Prepared with an automated research workflow and published only after evidence and policy checks.